Scintam Engineering
About ARTES

CORE REMANUFACTURING · FASTENER EXTRACTION ROI

ARTES ROI Calculator

Model the additional reman revenue and labour savings created by ARTES

Net benefit / mo

£38,081

after ARTES cost

Additional reman revenue

£29,081

 

Labour cost saved

£11,250

 

Units recovered / mo

106

 

Inputs
Adjust the assumptions for your operation.Start with Volume — every other tab is pre-filled with sensible defaults.

Enter your monthly core volume and the mix across A-, B- and C-grade cores (shares should sum to 100%).

Your monthly throughput.

%
%
%

A + B + C currently = 100%

Per-grade breakdown

Additional reman revenue

£29,081

GradeCoresRecoveredRevenue
A7505£1,485
B1,00036£9,900
C75064£17,696
Total2,500106£29,081

Revenue = recovered units × average selling price. Labour savings are shown separately in the ROI Summary. Recovered units scale with the seized-fastener rate, which is highest on lower-grade cores.

ROI Summary
Per month, all grades combined.
Additional reman revenue£29,081
Labour cost saved£11,250
Total monthly benefit (revenue + labour savings)£40,331
Net benefit / month£38,081

Payback

3.5 mo

5 Year ROI Multiple

16.9×

Share these results
Send this exact scenario to a colleague or customer.